§ 350-40. Approval of Development Conformance.


Latest version.
  • 350-40.1Prerequisite to Final Plat authorization, or issuance of Certificate of Completion. This approval shall be a prerequisite to the approval of a Final Plat or issuance of a Certificate of Completion for any part of a project or issuance of a Certificate of Completion for any part of a project included in a development permit, except for single-family and two-family residential structures. The approval shall reflect the owner's certification that all site work and construction has been accomplished according to the terms of authorized plans and permits, and that all facilities intended for maintenance, supervision and/or dedication to the public are in compliance with appropriate standards, regulations, codes and ordinances. Such approval shall be revoked in cases of fraud or whenever unauthorized changes are made to the site without the benefit of required permits.

    350-40.2Submission Requirements. Upon completion of the project as authorized for construction by the development permit, the owner shall file a Certificate of Development Conformance with the Director along with record drawings of all storm water detention facilities and modifications to the limits of the 100-year floodplain (if any). An "as-built" hydrology study for the project with the actual parameters from the record drawing of the detention facilities. A record drawing of the sanitary sewer facilities shall also be prepared, separately or included with the above, and submitted to the Water and Sewer Plan Review Section of the Department of Planning and Development in accordance with their regulations. The Certificate of Development Conformance shall be in a form as required by the Director and shall be accompanied by a Development Performance and Maintenance Agreement completed in draft form. If the owner is a corporation, the documents shall be signed by the President or Vice President, be affixed by the corporate seal, and either the corporate secretary shall attest to the signature and affix the corporate seal, or a Certificate of Corporate Resolution shall also be submitted.

    350-40.3Approval. Following final inspection and approval of all record drawings, the Director shall approve the Certificate of Development Conformance.