§ 340-80. Water and Sewer As-Built Plan Review Process.  


Latest version.
  • All constructed improvements, including but not limited to the extension, replacement, or new installation of any portion of the water distribution system or sanitary sewer system, shall be submitted for review and approval by the Stormwater, Water and Sewer Plan Review Section of the Department. The design and construction of such improvements shall comply with the current policy and procedures of the Gwinnett County Department of Water Resources and in accordance to the following documents as applicable: The Sanitary Sewer Installation Regulations and Specifications, also known as the Sanitary Sewer Standards Manual and the DWRSSS; The Sanitary Sewer Pump Station and Force Main Design and Construction Standards for Developer Installed Systems; The Water System Design and Construction Standards, also known as the Water Main Design and Construction Manual: and the Gwinnett County Backflow Prevention Manual.